一. Entrance Control:
1. Clean safety shoes with shoe cover and helmet are required in the clean stage
2. All person shall not enter or exit from closed door or other location except designated air lock room.
3.Forbid entering with other worker badge.(200 RMB confiscate both badges
4.Entrance control for materials, machines, tools shall be assured,these materials is clean and without oil stain.
5.Bringing unapproved tools and materials.
6. Material entry or exit form special materials entrance.
7. Cleanroom gloves are required in the ultra clean stage area.
8. Clean working clothes are required in the ultra clean stage area.
二.Cleanroom Housekeeping
1.Trash dumpsters or containers must be used in fab by all.
2.Materials for the interior of the building will arrive on site individually packed. Dirty materials shall be unpacked outside the building in a designated area. The outer box will be removed and disposed of into trash containers.
3.Orderly storage of material at designated area has to be assured during all stages of construction.
4.Vacuum cleaners have to be used to remove dust/rubbish; Brooms are not allowed(Daily housekeeping).
5.Vacuum cleaners have to be used to remove dust all time when carrying out dust working, such drilling.
6.HEPA filter vacuum cleaners have to be used to doing housekeeping.
7..All trash must be collected at any moment during work.
8.Tidy your work area after work done.
9.All trash and spent materials must be removed daily.
10.Tidy your storage area.
11.No smoking allowed in clean room.
12.No food or beverages allowed in clean room.
13.Forbid urinating or spitting.
三.Cleanroom Construction Requirement:
1.No work without permit or expired permit
2.Wipe down ladder before entering clean area, especially working platform.
3.Dirty platform must be removed form cleanroom.
4.Unpainted sprinkle pipe on raise floor in cleanroom.
5.Dirty work not allowed without approved isolation.
6.Temporary construction walls must be erected to isolate cleanroom from contamination generated during work.
7.Forbid to do any cutting in cleanroom.
8.Booth must erect for welding or hot work.
9.Gas cylinder should wrap with plastic sheet.
10.Placing and isolating wires and cable on height.
11.Keep the corridor clean and clear; do not obstruct the corridor.
12.Forbid opening any emergency door except emergency.
13.Prefabrication shall complete outside of the cleanroom when using welding or cutting.
四.Piping foothold
1.Only Scrubbed/general exhaust ducting and electrical cable tray are sufficient strength for foothold.
2.No step or pull PVC piping, plastic piping, hazardous chemical pipes, small stainless steel pipes, etc.
3.Do not step on FFU.
五.Protection for ground and wall
1.Scaffold wheels or any other wheels shall be wrapped with approved tape to protect ground.
2.Note booties on ladder feet. .
3.Noted new cleanroom taped to wheels if it was dirty.
4.Replaced a new cleanroom taped if it was lose or damaged.
5.Must lay floor protection vinyl sheet or plastic sheet below ladders or working platform.
6.Lay floor protection vinyl sheet or plastic sheet below materials.
7.Avoid oil stains on the floor due to the dirty work at cleanroom.
8.Do not lay any materials or tools next to cleanroom wall; Away cleanroom wall at least 1 meter.
9.Moving tools or materials must be off ground.